Use the CAD date, NC value, for the brace gusset plate to create an accurate template and produce the product with minmal error. | |
Butt welding part is subject to the UT(Universal Time) inspection. Beveling edge preparation and back plate weld tabs are temporary attached. |
|
Conducted multi-layer welding | |
A type H steel pillar and a beam are assembled and conducted the finishing welding work. SS400 Delivered to petro chemical plants |